Active carbon made of brown coal and stone coal


Name
Parameters
Function
Productiin of the hightest quality active carbon from brown or stone coal or coal dust .
Trademark 
LU-АU-10 000 EURO
Trademark owner
Mega Power Hong Kong group limited
Developer
Russia, China, Israel 
Licence owner 
Mega Power Hong Kong Group Limited 
Assembly and technology 
 
A list of units of carbonization section 
Basic assembly 
Coal raw material preparation sectiion, productivity 5-6 tons/hour, 120-130 tons/day .
Scarfer  1 unit
Feeding hopper 1unit
Conveyors 7 units.
Coal chipper   1 unit.
Vibration screen  1 unit.
Double hopper for raw materials 1 unit.
Dust  arrester  1 unit
Spiral conveyor  1unit
Conveyor driving feeding unit for press  1 unit
Magnetic separator 1 unit.
Coal drying machine  1 unit
Thermal unit  1 unit
Spark  suppression device 1 unit
Air blower   1 unit.
Briquetting press  1 unit.
A liist of units of activation section
Activation section, all-the-day round activities.
Productivity 30-32 tons/day  12 000-tons/year 
Conveyors 20 units.
Magnetic separator 3 units.
Cauldron 1 unit
Boiler  6 units.
Forklift 3 units.
Packing tables 30 units
Electronic batching device 3 units.
Self-propelledd lifting trolleys 6 units.
Crusher 1 unit.
Fine vibration screen 1 unit.
Activation kiln 10 units.
Crusher 1 unit.
Pallets 96 units 
Cleaning tank 1 unit.
Dust removal system 3 units.
Weighing machine  1unit.
Batching machine  1 unit.
Sealing machine  1 unit.
Gas holder  6 units.
Commutation system, 12 units.
Instrument control panel , 3 units.
Ventilator, 25 units.
Compressors, 3 unit.
Lab system , 1  set .
Decompression device 10 units.
Exhaust gas utilization equipment 10 units.
Dust removal in crushing 4 units.
 
Packing and warehousing 
Conveyors 4 units.
Crusher 1unit.
Film packing machines . 2units.
Self-propelled lifting trolleys, 2 tons - 1 unit.
Sorting machines 2 units
General info 
 
Operation mode 
23 hours/day, 300 days/year 
For activation shop 
Fuel granules produced for a month , one shift operations. Raw materials - coal dust 
4 000 tons
Productivity/year at all-the-day round operations of active carbon section 
12 000 tons of active carrbon 
Productivity/day at all-the-day round operations of active carbon section 
34-35 tons of active carbon 
Productivity/month at all-the-day round operations of active carbon section 
1000 tons of active carbon 
Staff 
40 persons
Power consumption 
1 500 kw/hour
Thermal eneergy requirements 
18 000 kcal \hour
Completeness of the equipment 
All included 
Warranty
1 year 
Footage 
 
Designed production area 
3600 m2 из including
1 000 m2 indoors and  1000 m2 оoutdoors 
The production line is divided into shopa
 
-- raw materials preparation, crushing and ddrying 
600 m2  Indoors (30m х10 m)
--Activation and washing shop 
2 750 m2 Indoors 
--sorting and packing shop 
200 m2. Indoors 
--Warehouse
400 m2
Rae materials specifications 
 
Raw materials
Sawdust 
1 ton of active carbon requires as follows 
4 tons of coal 
Water demand / hour
100 m3/hour
Additional fuel demand 
1 ton/hour
Electric power demand 
2400 kW
Production standard 
 
Active carbon 
 
Number of grains of size 1 mm
< 1,0 
Number of grains of size 1 – 3,5 mm  
>96,5 
Number of grains of size 3,5-5 mm
< 2,5
Moisture contents
<10,0
Ash content                                       
< 8,0
Porosity (by acetone) 
> 74
Static activity by chlorine  
>35
Mass of 1 ton of carboon 
no more than 0 grams (without compaction ).
Fuel  granules made  off coal dust 
 
Size
30-60 mm
Density 
Depends on quality, at t least 1,80 gr/m3 
Heat exchange
At least 4500 kcal 
Transportation
 
Transportation
32 
Transportation of activation kilns 
10- 40 ft.containers
Transportation of other machines 
3- 40-ft.containers 
Transportation of dust removal 
1- 40 ft. container
Transportation shop vehicles 
4 separate places on tthe platform and one 20 ft, container 
Transportation of cualdron 
4 platforms
Transportation of conveyors 
2-40-ft. containeners 
Transportationn o of packing equipment 
2- 40-ft. conttainers 
Transportation of gas holder 
6- 40 ft. container 
Other conditions
 
Time of mounting 
10-12 weeks. including training of personnel 
Payment terms 
Advance - 50% , 20% in 90 days, and 30% when the cargo is being prepared for shipnent but before crossing the border of PR China 
Cost of starting up and adjustment
15% of the equipment price. The price iof equipment doesn't include starting up andd and adjustment 
Not complete delivery 
Some units and sections can be supplied separately.
Mounting starting up and adjustment require 
10 persons
Time of manufacturing of the equipment 
4 months 
Documents 
 
Certificates for machines 
22 pcs
Foundation drawings 
10 pcs
Blockouts drawings 
8 pcs
Kiln drawings 
5 pcs
Press drawings 
4 pcs
installation drawings 
1 pcs
Electrical prospecting drawings
1 pcs
Drawings of separate units
6 pcs
Languages of documents
Chinese, English, Hebrew, Russian
The equipment is certified  
China, EC, Israel, UAE, Russia, Kazakhstan 
Total numbet of certificate
24 pcs
Customs codes
Customs codes for the equipment 
Hopper 7309 00 900 0,
kiln 8417 80 200 0,
bucket elevator  8428 32 000 0,
belt conveyor  8428 90 910 0,
raw material feeding mechanism  8428 90 910 0,
press 8474 80 000 0,
mixer  8474 39 900 9,
crumbling machine 8474 20 900 0, 
raw materrials electric measuuring device  8423 20 000 0,
raw materials feeding device 8430 31 000 0

 