Technological schemes for arrangement of brick equipment

 
1. Cement added brick production line (with vibration press)
2. Steam assisted slag-lime brick production line (with vibrations press)
3. Flow chart for equipement placing in production of chemically bonded brick using hyperpressing
4. Flow chart for equipement placing in production of burnt brick using hyperpressingТ
5. Flow chart for equipment placing in production of high quality chemically bonded brick using hyperpressing

 
1.Cement added brick production line (with vibration press)
 
 
 
  
 1. Sand Supply
2. Slag and cement supply
3. Batching and adding of water
4. Adding of binding material (Or dye for colored brick)
5. Formation by double action press
6. Warehousing
7. Reloading
8. Transportation

2.Flow chart for production of slag-lime brick using vibration press with assistance of steam on vibration press
 
 
  1. Sand supply
  2. Slag and lime supply
  3. Batching, mixing and adding of water
  4. Slaking
  5. Adding of binding material (Or dye for colored brick)
  6. Formation by double action press
  7. Loading
  8. Transportation to steam kiln
  9. Steam kiln
  10. Transportation


 
3.Flow chart for equipment placing in production of chemically bonded brick using hyperpressing 
 


4.Flow chart for equipment placing in production of kilned brick using hyperpressing
 


5. Flow chart for equipment placing in production of high quality chemically bonded brick using hyper pressing