equipment
chinese machinary      chinese equipment      

Soya asparagus production equipment


Productivity (24 hrs)

Production of soya asparagus 140 kg requires 200 kg of soya .
Production of 75kg/day of soy asparagus requires 150 kg of soya

Name pc Size
Evaporator 1 pc 8,8*1.88m*1.20mm
Soya-bases milk refiner 1 pc  
Molds 8 pc 2.2m*0.93m
Soya-based milk pouring trays 1 pc 2m*880 mm *60mm
Soya-based milk storage vessels 1 pc Ф750m*580mm
Ф800m*1000mm
Ф600m*600mm
Boiled soya-based milk tank 1 pc Ф1.2m*1.1m
Heat exchanger 1 pc 950mm*450mm*1000mm
Soya-based milk extraction vessel 1 pc Ф800mm*1.5m
Cabinet 1 pc 1.3m*1.6m
1-inch tube 40m Ф25.4mm
Valve 12 pc  
Cross bar 3 pc  
Т-joint 1 pc  
Soya-based milk suction pump 1 pc  
Elbow fitting 10 pc  
Sieve 2 pc  
Scraper 2 pc  
Partition 1 set  
Warranty 1 year  
Power 20 kW  
Shipping 1 container, 20 ft, 1 container – 40 ft  
Manufacturing time 90 days  
Personnel 3 persons  
Shop area   20 m*5 m * 3 m

Evaporator

Ready-fitted machine


 


Main page | News | Guestbook | Contact us
Русская версия
Equipment > Food equipment >