equipment
chinese machinary      chinese equipment      

Individual living houses for Central part of Russia


Individual single-storied house (42 m2 )for central part of Russia  

Aseismic stability - 8 points by Richter scale
Design life - 75 years
Weight of structures - 1m2 / 33 kg.
Total weight of structures - 50 tons
Snow loading on building is up to 120 all over
Color of structures - saturn red,
Temperature mode - down  to  400 below zero
Fire safety - Grade  4А
Site area  42 m2 (6 m*7m)
Useful area  33 m2.
Height  0 -4700 mm
Operating span height 2800 mm
Columns = 5
Windows, - 5. height -1710, length - 700-1400 mm
It is possible to build over the second and the trird floor
 
2. Roofing

Roof ridge height - 1500 mm
Slopes of roof - 2
Spans -  1
Roof framings,  step - 6000 mm , material - steel angle bar,  63х10
Number of roof framing - 2
Materials - glass-magnesium boards and roofing and EPDM-based roofing materials, US technology
Step of roof framings - 6000 mm
This structure of roofing
 
3. Zero and floor

Floor height -  0 - 0,3m
drainage fill, crushed stone  150 mm
landfilling for  laying concrete 50 mm
Concrete floor  210 сm.
Foundation -embedding 3100 cm 5  piles all metal structures included .
Floor filling is included in the price .

 4.Walls
 
Wall thickness - 320 mm
Filler: Foam plastics
Bearing square columns,  beam 150х150х7mm.
Materials: foam cementing easily mountable structures .
Inner wall coating - glass-and-magnesium sheet .
Outer wall coating - glass-and-magnesium sheet with waterproof  plasterwork and silicon-organic paint
Such a design of walls makes it possible to place autonomous heating system and additional layer of  thermal protection

 5. Set

1
Panel 150 mm 0,405 m3/ pc
42 pcs
2
Panel 100 mm 0,27 m3/ pc
53 pcs
3
Column
5 pcs
4
Necking
6 pcs
5
Standard window 140 х170
3 pcs
6
Small window 0,7х170
2 pcs
7
Room dividing door 1000 mm
3 pcs
8
Bathroom door 900mm
1 pc
9
Entrance door  1200mm
1 pc
10
Outer board casing
80 m2
11
Inner board  casing
160 m2
12
Column concrete grouting
3m3 m500
13
Drawbar concrete grouting  
4m3 m300
14
Underside concrete grouting
4m3 m150
15
Inserts
400 pcs
16
Floor lags, 7 m
20 pc,  140 running meters 
17
Roof framings  6000mm
2 pc
18
Roofing lags  7m
9 pc 60 running meters
19
Mounting mastic, 350 running meters, 700 kg
2m3
20
Sealant 300 running meters  
2m3
21
Modern ruberoid
56m2
22
Glass-and-magnesium waterproof  base, 10 sheets 3,6 х1,2
56m2
23
Bonding mastic  1 barrel, 20kg
56 kg
24
Dowels,  screws, etc
2000 pc
25
Silicon organic paint
20 kg
26
White paint for internal works
40 kg
27
Water-repellent outer mastics
200 kg
 
Not included
 
 
No electrics
 
 
No sanitaryware
 
 
No heating
 
 
Inert: coke or crushed stone
4 m3
 
Slits of holes for foundation  Ф 420 mm 1000 mm depth
5 pcs
 
Zero works
 

Transportation : two 40ft containers and one 20 ft. container
 