equipment
chinese machinary      chinese equipment      

Prefabricated industrial buildings and facilities


Industrial building  4 800 m2 made of easy-mountable light weight structural units

1.Type of object
Aseismic stability - 5 points by Richter
Design life 75 years
Weight of 1 m2 of a structural unit  - 33 kg .
Total weight of structural units  210 tons
Snow load on the roof, up to 120 cm along all the surface.
Color of structural units - saturn red
Temperature mode - down to -50 C
Fire safety of structural units - 4 A category
Area  4800 m2 
60  х 80 meters
Height  0 -7400 mm
WOrking height of the span 6 200mm
Number of columns in the shop  -24
Gates -6, standard size - 4 700, height  3 900 (size by order is possible)
Windows 470 m2, plastic, two layers,  surrounding, continuous.
Height of windows - 0- 4300 mm
No additional floors are supposed.

2.Roof

Roof ridge height -  1000 mm
Slopes - 6
Spans-  3
Supporting roof, step  6000 mm , material steek angle bar  63х10
Number of supports 42 units .
Material: sandwich panel,  100 mm filling -  synthetic filler
Step of supports - 6000 mm
Width of span  20000mm
Such construction of the roof  is due to possibility to place autonomous heating system, based on solar stations on the roof

3. and floor

Floor height -  0 - 0,4м
drainage fill, crushed stone  150 mm
landfilling for  laying concrete 50 mm
Concrete floor  20 см.
Foundation -embedding 3100 cm 62 piles all metal structures included, concrete excluded .
Floor filling is not included in the price .

4.Walls

Central bearing columns. there are beam crane (cargo capacity up to 5 tons) that  should be mounted on the columns 
Wall thickness - 170 mm
Filler: Synthetic filler 
Bearing square columns,  beam 150х150х7mm, doubled for beam crane.
Materials: foam cementing easily mountable structures .
Inner wall coating - glass-and-magnesium sheet .
Outer wall coating - vinyl
Such a designof walls makes it possible to place autonomous heating system and additional layer of  thermal protection
It prolongs designed service life from 50 to 75 years.

5.Technical documents

File
Plan of insulation and warmth-keeping
Plan of drilling
Plan of mounting of roof supports
Plan of piles mounting
Plan of columns mounting
Plan of mounting of wall constructions
Plan of mounting of  attached devices
Plan of mounting of windows
Plan of mounting of  roofing plates
Sertificates of  State Standards - 11 pcs  
 
6. Mounting

Name
Amount
Note
1
Engineers
2 persons
(120  man-days)
2
Workers
10 persons
(600 man-days)
3
Subsistance money
 
By Chinese standards for the Customer's country
4
Travel (including travel inside China, visas, arrival to/departure from the Customer's country
 
The customer provides travel from the airport to  the project site and back
5
Interpreter
 
Provided by the Customer
6
Workers' accommodation
Hostel
Provided by the Customer
7
Engineers' accommodation
One room for one person
Provided by the Customer
8
Three meals a day
Workers' canteen
Provided by the Customer
 
 
7. Materials to be purchased on the spot.  operations  to be performed by the Customer

9
Volume of  М 400 concrete
136 m3
to foundation and necking
10
Floor  М 150 concrete
1000 m3
 
11
Drilling Ф 420 mm х 3000 mm
200 running meters. 62 wells
 
12
Landfilling with inert materials. Broken stone  5000х 0,15
800 m3
 
13
Landfilling by sifting 5000х0,05
300 m3
 
14
Concreting of  detour path, 280х 1 m,  М 150
14 m3
Around the building, width  - 0,7 m.
15
Concreting gate exits  М 400
40 m3
 
16
Operations by 0
The volume is determined by place
 
Harware lease
17
Lorry-mounted crane, 3 tons, boom 8 meters, lifting heigth -10 meters
2 units.
20 days
18
Lorry-mounted crane, 1 ton, boom 3 meters, lifting height- 5 meters,
2 units
40 days
19
Diesel or electric loader, 3 tons, height- 210 cm
2 units
for all the time of the operations' performance
20
Elevator, winch with lifting height up to 7 meters
2 units
for all the time of the operations' performance
21
Concrete pump
1 unit
8 days
22
car of van for economic needs
1 unit
for all the time of the operations' performance
23
Roller for broken stones
1 unit
2 days
Materials and instruments
24
Angle-grinding saw with diamond disks
4 units.
for all the time of the operations' performance
25
Pneumatic gun
4 units.
for all the time of the operations' performance
26
Welding ujit
3 units
for all the time of the operations' performance
27
Vibration ruler
2 units
8 days
28
Immersion vibrator
4 units
8 days
28
Circular saw
1 unit
for all the time of the operations' performance
30
Sledgehammer
2 unit
 
31
Crane jack
2 unit
 
32
Electrodes
1200 pcs
Ф8
33
Mounting belts
14 pcs
 
34
helmets
14 pcs
 
35
Working gloves
100 pairs
 
Is not included
36
Delivery of communications to the building
 
 

8. Addiitional offers
 
Name
Transportation
Price
1
Mounting of  automomous water heating system
1
60000 $
2
Mounting of  autonomous solar heating system
2
120000$
3
Mounting of automatically opening/closing gates + steel shutters
1
30000$
4
Laying of  underground cable channels for  power system
 
to be agreed upon
5
Mounting on the roof and snow removing systems for roofs
1
80000$
6
Two-fold increase of  thermal stablity of the building due to additional layer of  heat-insulation
2,3
33000$
7
Spraying of special coating on the floor to prevent  breaking of  fallen things, for anti-acid and chemical  protection, for color separation of working zones and transportation zones, for reduction of the noise level . 2000 m2
1
57000$
8
Mounting of ground connection
 
1500$

9.Photo

Appearance of  an office building -facade
 

Office building - top view and shorter side
  

Attachment of the building with  production complex
 


Separate shops
   

facility for warehouse


Top view with additional windows



Attachment of the foundation piles and bearing columns for beam crane


docking unit of foundation with non loaded column


Outer facing of the walls


mounting grooves of wall structures


lightweight quickly mountable structrues

 

Packaging arrangement of  HONG KONG MEGA POWER Co. LTD.
Tel./fax: 86-(451) 82432987
E-mail: mega-power@asia-business.biz
 

 


Main page | News | Guestbook | Contact us
Русская версия
Mini-factories > Prefabricated industrial buildings and facilities >